Well casing with noncementing liner with washing through a shoe with an option of rotating during running in and zonal isolation by swellable packers
For well casing with noncementing liner with washing through a shoe and zonal isolation by swellable packers the following
assembly is used:
- PHN UIF-type hanger or PHNV-UIF (if rotation is needed during running in);
- Low-friction and spring centralizers;
- FS or FB filters (it depends on collector resistance);
- UIF sealing unit;
- Check valve (only in case when FS filter is used);
- Shoe.
After liner assembling, the tubing string with a polish rod at the end is RIH till its setting into UIF sealing unit.